From greenfield to turnkey, engineered for flow.

Lean Facility Design is delivered as modular engagements — from a core lean blueprint to a fully engineered, turnkey factory.

Faber Infinite · Lean Facility Design

15 engineered steps.

Where Most Factory Layouts Quietly Bleed Money

The Hidden Cost of Poor Layouts

30%+ of operating cost is locked inside avoidable movement, congestion and rework; invisible on the P&L, but visible on the shop floor.*Faber Infinite Research

Tangled Material Flow

Material crisscrosses the plant instead of moving linearly.

Overstocked, Congested Stores

Excess WIP and finished goods hidden across the shopfloor.

Excessive Travel Distance

Operators and forklifts cover kilometers daily - most of it waste.

Poor Space Utilization

Floor area lost to old material, scrap and unplanned WIP buffers.

Bottlenecks & Long Lead Times

Capacity ceilings nobody mapped before the lines were laid.

Safety & Supervision Gaps

Blocked sightlines, unsafe forklift paths, audit risk.

What Poor Layouts Cost Manufacturers

30%
Productivity loss

Material crisscrosses the plant instead of moving linearly.

40%
Excess floor area

Operators and forklifts cover kilometers daily, most of it is waste.

4X
Excess inventory holding

Excess RM, WIP and FG hidden across the shopfloor.

25%
Extended lead times

Delays arising from prolonged process lead times.

50%
Lower production

Capacity nobody mapped before the lines were laid.

₹10–50Cr
USD 5MN
Blocked capex

Locked in machines, MHEs, and warehouse.

Typical Steps: Lean Facility Design

A 15-step framework structured into three phases - Planning, Flow Integration and Execution Readiness.

Phase 1

1

Training and Orientation

2

Product, Process, Quantity Analysis (PPQ)

3

Value Stream Identification

4

Value Stream Mapping (CSM, FSM)

5

Flow Management

Phase 2

6

Capacity Planning and Ramp-up Plan

7

Equipment Planning Guidelines

8

Manpower Planning Guidelines

9

Supply Chain Design

Phase 3

10

Flow Supermarket & Line Side Design

11

Conceptual Material Handling Design

12

Layout Design

13

Visual Management Guidelines

14

Risk Assessment

15

Project Rollout Plan

Design Your Factory of the Future

Lean Facility Design is delivered in four modules - from the core lean layout blueprint to a turnkey, fully engineered factory.

LFD Core

The essential lean layout blueprint

Value stream mapping, flow design, layout options and an execution roadmap - the foundation of a lean factory.

LFD Smart

Blueprint + planning & 2D CAD

Adds PPQ analysis, capacity & manpower planning, equipment selection, inventory frameworks and 2D AutoCAD drawings.

Most Popular

LFD NextGen

Digitally validated factory design

Adds 3D modelling, Industry 4.0 readiness, automation conceptualization and critical decision-point analysis.

LFD NextGen+

Turnkey factory of the future

Everything, plus 3D walkthroughs, simulation, complete engineering & infrastructure support and end-to-end PMC.

Scope of Work & DeliverablesLFD CoreLFD SmartLFD NextGenLFD NextGen+
Section 1: Lean Facility Design & Operational Blueprint
Capability Development & Analysis
Training & orientation of project team members
Product–Process Quantity Analysis (PPQ)-
Value Stream Mapping (CSM & FSM), Spaghetti Diagrams & Transportation Index
Future-State Design & Flow Management
Flow design & line-side optimization
Supply chain and supermarket design
Planning & Resource Optimization
Capacity planning & ramp-up strategy-
Manpower requirement planning-
Equipment selection guidelines-
Layout, Safety & Workplace Efficiency
World class, efficient layout design options
Ergonomic and safety guidelines-
Visual factory design standards-
Material & Inventory Optimization
Inventory optimization through customized frameworks (zero shortage, no overstocking)-
Improvement & Decision Support
Action plan for key process improvements
Identification of critical decision points--
Execution Roadmap and Deliverables
Comprehensive executive report covering objectives, observations, challenges, actions taken, quantified benefits, and detailed implementation roadmap
Section 2: Design Visualization & Simulation Suite
2D AutoCAD drawings-
3D modelling (AutoCAD)--
Section 3: Strategic Enhancements & Value Additions
Documentation & knowledge transfer
Industry 4.0 Readiness Assessment--
Risk mitigation assessment-
5 copies of the exclusive Lean Facility Design (LFD) book
Included–  Not included

Peripheral Offerings (on request)

Your Complete Ecosystem for Plant Development & Transformation

CategoryAdd-on
Visualization & Simulation3D walkthrough video for spatial understanding
Simulation models for flow and operational validation
Strategic EnhancementsAutomation conceptualization & implementation support
ESG guidelines integration
Inputs from Vastu consultant (if required)
Civil, Structural & Architectural SupportArchitectural planning & site development
Structural engineering
Utilities & Technical SystemsElectrical systems
Plumbing & drainage (Public Health Engineering)
Fire protection & detection systems
HVAC (air conditioning & ventilation)
Air, gas & water systems
STP & ETP systems
Industrial InfrastructureCrane planning
Machine shifting & MEP integration
Sustainability & EnvironmentGreen building design (IGBC Platinum standards)
Landscaping
Project Management & Implementation SupportPMC (Project Management Consulting) support
End-to-end implementation support
Resource planning & governance framework
Post-audit support

How We Work With You

Robust Engagement Structure

Every engagement is layered with senior oversight, dedicated delivery leadership and independent quality assurance - so results don't depend on any one individual.

  1. Client

  2. Client Engagement Advisor

    30+ years of exp
  3. Business Head

    ~20 years of exp
  4. Client Engagement Manager

    ~10+ years of exp

Supported throughout by

Business Alliances
Delivery Team
Body of Knowledge
Quality Assurance

Engineering the Future Through 3D Visualization

Walk Your Future Factory Before It Is Built

From block layouts to immersive 3D walkthroughs and simulation models - validate flow, space and capacity decisions before committing a single rupee of CAPEX.

01

Block Layout

Macro flow optimization - zoning, adjacency and material flow direction decided before a single wall is drawn.

02

Detailed Layout

Workstation-level design - every machine, rack, gangway and utility positioned for flow and safety.

03

3D Walkthrough

Immersive validation - walk your future factory in 3D, catch issues and win stakeholder buy-in before construction.

Not sure which module fits your project?

Talk to our Lean Facility Designexperts — we'll assess your greenfield or brownfield project and recommend the right scope.

Book Free Consultation
Schedule a meetingChat on WhatsApp (opens in a new tab)Call us